Construction and renovation in Catalonia
Services · Renovation

Kitchen renovation

Kitchen renovations coordinating the building work, services and finishes so everything fits the cabinetry and actual use.

Reference render of a kitchen mid-renovation with base units being fitted.
Reference image · illustrative render

What it involves

A kitchen brings together water, electricity, gas and ventilation. We renovate it by coordinating the services with the layout and the cabinetry, leaving everything ready for a clean installation.

What's included

Demolition and preparation
Plumbing, electrics and sockets
Ventilation and cooker-hood extraction
Wall and floor finishes
Supporting works for cabinetry installation

The exact scope is defined in writing for each project. It does not include items that are not agreed.

When this service makes sense

  • You want to renew the kitchen completely
  • You are changing the layout or extending the space
  • The kitchen is included as part of a full renovation

How we work

1

Conversation and visit

2

Quote and contract

3

Permits and preparation

4

Execution with reporting

5

Handover and warranty

Permits and regulations

We can coordinate with architects and technical specialists, but the final decision on permits rests with the local council. This page is informational and does not replace the judgement of a qualified professional.

Frequently asked questions

What does a kitchen renovation usually include?
It normally includes demolition and preparation, plumbing, electrics and sockets, ventilation and cooker-hood extraction, wall and floor finishes, and the supporting works for fitting the cabinetry. The scope is set in writing according to the project.
Do you coordinate the kitchen work with the cabinetry installation?
Yes. A kitchen brings together water, electricity, gas and ventilation, and we leave the services prepared to match the layout and the planned cabinetry so the installation goes smoothly. It helps to have the kitchen design confirmed early on.
Can I remove a wall to open up the kitchen?
Sometimes yes, but first it has to be confirmed whether the wall is load-bearing. If it is, a technical assessment is needed and, depending on the case, a project and a permit. This is not decided without checking.
In what order is a kitchen renovation carried out?
Normally: demolition and preparation, services (water, electrics, ventilation), wall and floor finishes, and finally cabinetry installation and final finishes. Coordinating this sequence well is what avoids rework.
Can I source the cabinetry myself?
Yes. We can coordinate with your cabinetry supplier and leave the building work and services ready for installation. If you share the kitchen drawings with us, we factor them in from the start.

Tell us about your project

We'll give you an indicative quote and a clear scope before we start. The timeline and price depend on the project, the ground, the materials, the permits and the finishes.

Or call us directly: +34 633 154 728